(1)
J, R.; V, T.; Lokesh Kumar Reddy, C. A Study on Multiple Crew Based Productivity Scheduling Method in Construction Projects. IJET 2018, 7 (2.12), 454-458. https://doi.org/10.14419/ijet.v7i2.12.11516.