(1)
Adly Ishak, F.; Khudri Johari, M.; Dolah, R. A Case Study of LEAN Application for Shortest Lead Time in Composite Repair Shop. IJET 2018, 7 (4.13), 112-119. https://doi.org/10.14419/ijet.v7i4.13.21341.