(1)
Chien, Y.-H.; Chiang, C.-P. Optimal Age for Preventive Replacement of A System With GPP Repair Process. IJET 2018, 7 (4.38), 1627-1629. https://doi.org/10.14419/ijet.v7i4.38.29219.