(1)
Bhat, R.; Mohan, N.; Naidu, M.; Shivamurthy, S. Reducing the Production Lead Time of an Industry Using Value Stream Mapping Integrated With Kaizen. IJET 2018, 7 (4.41), 21-23. https://doi.org/10.14419/ijet.v7i4.41.24291.