Kim, J., & Won, J. (2018). Construction Period Analysis of HPC Method by PC Construction Project Cases in KOREA. International Journal of Engineering & Technology, 7(3.7), 440-443. https://doi.org/10.14419/ijet.v7i3.7.18901