Chien, Y.-H., & Chiang, C.-P. (2018). Optimal Age for Preventive Replacement of A System with GPP Repair Process. International Journal of Engineering & Technology, 7(4.38), 1627-1629. https://doi.org/10.14419/ijet.v7i4.38.29219