[1]
R. J, T. V, and C. Lokesh Kumar Reddy, “A Study on Multiple Crew Based Productivity Scheduling Method in Construction Projects”, IJET, vol. 7, no. 2.12, pp. 454–458, Apr. 2018, doi: 10.14419/ijet.v7i2.12.11516.