[1]
G. Yedukondalu, M. Thakare, V. Anvesh, R. Hokesh Reddy, and A. Cheetri, “Scheduling and Control of Parts in FMS industry”, IJET, vol. 7, no. 2.24, pp. 214–219, Apr. 2018, doi: 10.14419/ijet.v7i2.24.12034.