[1]
J. Kim and J. Won, “Construction Period Analysis of HPC Method by PC Construction Project Cases in KOREA”, IJET, vol. 7, no. 3.7, pp. 440–443, Jul. 2018, doi: 10.14419/ijet.v7i3.7.18901.