[1]
T. Subramani and A. Ammai, “Maturing Construction Management Up The Bim Model & Scheduling Using Primavera”, IJET, vol. 7, no. 3.10, pp. 1–4, Jul. 2018, doi: 10.14419/ijet.v7i3.10.15617.