[1]
F. Adly Ishak, M. Khudri Johari, and R. Dolah, “A case study of LEAN application for shortest lead time in composite repair shop”, IJET, vol. 7, no. 4.13, pp. 112–119, Oct. 2018, doi: 10.14419/ijet.v7i4.13.21341.