[1]
Y.-H. Chien and C.-P. Chiang, “Optimal Age for Preventive Replacement of A System with GPP Repair Process”, IJET, vol. 7, no. 4.38, pp. 1627–1629, Dec. 2018, doi: 10.14419/ijet.v7i4.38.29219.