[1]
R. Bhat, N. Mohan, M. Naidu, and S. Shivamurthy, “Reducing the Production Lead Time of an Industry Using Value Stream Mapping Integrated with Kaizen”, IJET, vol. 7, no. 4.41, pp. 21–23, Dec. 2018, doi: 10.14419/ijet.v7i4.41.24291.