[1]
N. S. Pour, S. Zeynali, and M. Kheradmand, “Calculating the Fuzzy Project Network Critical Path”, IJET, vol. 1, no. 2, pp. 58–66, May 2012, doi: 10.14419/ijet.v1i2.43.