Bhat, Ritesh, et al. “Reducing the Production Lead Time of an Industry Using Value Stream Mapping Integrated With Kaizen”. International Journal of Engineering & Technology, vol. 7, no. 4.41, Dec. 2018, pp. 21-23, https://doi.org/10.14419/ijet.v7i4.41.24291.