Abdul Rahman, Ismail, et al. “Risk Assessment of Time and Cost Overrun Factors Throughout Construction Project Lifecycle: Pilot Study”. International Journal of Engineering & Technology, vol. 7, no. 3.20, Sept. 2018, pp. 717-23, https://doi.org/10.14419/ijet.v7i3.20.22980.